Showing posts with label Client Quilts. Show all posts
Showing posts with label Client Quilts. Show all posts

Thursday, July 9, 2015

Client Quilt

In early June, I was contacted to do the quilting for a local quilter.  She had originally planned on doing the quilting herself, but could no longer do it.  I was happy to do the quilting for her and we made the arrangements to send the quilt my way.

The quilt was a beautiful pieced quilt with embroidered blocks.  Each block was embroidered with a different type of flower as well as the name of the flower.  The client wanted something simple and left it up to me to decide whether to quilt over the embroidered flowers or around them.  After receiving the quilt, I definitely knew that I did not want to quilt over the flowers.  The were very pretty and I wanted my quilting to showcase her embroidery versus potentially covering it up at all.  The client was concerned with some puckering around the designs, but I was able to handle that with the quilting I chose.

Client quilt June 2015

I ended up using a variegated thread for the top portion of the quilt.  The color variation is very subtle, but has a pale pink, blue and green in it.  You can see it in person in the quilt on the white areas and it pulls the colors from the flowers a little bit here and there.

Client quilt June 2015

The top thread was called Morning Sky by Superior Threads (their King Tut line).  The bottom thread was a pale blue (Baby Blue) from Superior's Bottom Line thread line.  I've always had good luck with Superior Threads and haven't had issues with breakage.  Both of my sewing machines seem to love the thread.

Client quilt June 2015

I did a medium-sized loop design throughout the quilt.  I wanted to have the freedom to move about the embroidered spaces and still create texture throughout the quilt.  The client wanted to tie the sashings and blocks together, so the quilting extended throughout the entire quilt and around the flowers and embroidered names.

Client quilt June 2015


Client quilt June 2015

I used Quilter's Dream 100% cotton batting for this quilt.  Only one layer was used since I use their thickest loft...Supreme.  It almost gives the thickness of wool, but is great for someone who doesn't want the potential allergic issue with wool.

The next two photos show the completed quilt and really highlights the texture created with the loops and thicker batting.

Client quilt June 2015


Client quilt June 2015


Client quilt June 2015

The client also asked me to trim up the quilt and add the binding around the edge of the quilt.  I machine stitched the binding to the front of the quilt after squaring it up and left the hand sewing to her (at her request).

Client quilt June 2015


Client quilt June 2015


Client quilt June 2015


Client quilt June 2015


Client quilt June 2015


Overall, the quilt turned out really nicely and the client was ecstatic at the end result.  I always try my hardest to make each quilt something that I would be proud of to call my own.  The best part is that the client was very happy about the result of the quilting and it exceeded her expectations.

Here's a small bit from her email to me:

I just opened the box and I have only one thing that I can say about  your work... you took a first time attempt at making a quilt by me and turned it into a MAGNIFICENT  piece of art.  I am nearly speechless.  I knew it would be nice but I didn’t expect it to be this beautiful.  You are an artist and I hope you realize that.  What you did for my quilt was not an ordinary run of the mill quilting job... you knew how to highlight the embroidery and how to blend the rest of the quilt into one solid piece of art.  I am going to be so proud to give this to my daughter.  Thank you so much for putting the effort into it that you did.  It shows that you care about what you do. 

It makes me extraordinarily happy when a client really enjoys the end result! :c)

Happy Crafting!
~Sarah at upstateNYCreations

Saturday, December 29, 2012

Pre-Christmas Quilting

Its been a little while since I've posted.  Things got pretty hectic just before Christmas.  I had a client quilt to finish up by the 21st along with fitting in Christmas shopping and finishing up work for the year.

I'm not going to show the entire quilt for my client, but I'll show the backing and the quilting that I did on the quilt.  In this particular case, the client wanted me to follow the butterfly patterns that were on the backing material, so I had to load the quilt upside-down on my frame (i.e. top was on the bottom roller, and the backing was where the quilt top normally would have been).  This made it a bit more difficult as I couldn't actually see the quilt top itself.  When all was said and done, I had about 11-12 hours of work into this quilt.

Here's the backing material loaded onto the frame:

Client 2 - 1

The next series of photos shows the flowers, hearts and the butterflies I traced from the backing material.

Client 2 - 2

I even worked in some caterpillars and leaves as the client was going with a garden theme.

Client 2 - 3

Client 2 - 5

Client 2 - 6

It was an interesting quilt to stitch on and the client really liked the finished product.

Since today is Saturday already, the rest of my fun over Christmas will posted with the Sunday stash report as it will be the last report of the year.  I did get some yardage for Christmas, so I'll definitely be counting it this year!  :-)  Maybe my reports next year will be more in the black.


Happy Crafting!
~Sarah at upstateNYCreations

Tuesday, December 11, 2012

Make-A-List Monday

 Yes, I know today is Tuesday and my post title says Monday. :-)  This just shows how this week has been already.  It's been a bit crazy with work, Christmas shopping, dealing with 2013 healthcare issues, etc.  The last few weeks of the year area always crazy here at work and it seems to be a bit more so this year.

I didn't get everything done that I wanted to last week....

1. Prepare backing and baste the Lone Star Wall hanging. Nothing. :-(
2. Trim quilt top for Whirly Stars baby quilt and add binding. Done.  Starting hand-sewing binding.
3. Trim quilt top for charity quilt and add binding. Done.  Starting hand-sewing binding.
4. Post picture of Christmas tree and snowman applique project.  Nothing. :-(

While I didn't seem to get a lot done here, I actually did get a lot of things done.  On Monday evening (12/3), I received a call from a local quilter asking if I could quilt a for her.  We met Tuesday evening and she left her quilt with me.  I have to have the quilting done by the 21st.  It will be a bit interesting to quilt as the top isn't too terribly flat.  I think it will just be a lot of extra pinning to ease the bulk in without creating pleats.

I also wrote up Christmas cards (with hubby's help) and we completed about 90% of our Christmas shopping.  Yay!  We spent last Saturday doing a little bit of window shopping at the local mall.  It was EXTREMELY busy there.  It re-affirmed why I don't like going to the mall anymore.  We did pick up a few things for Christmas gifts, so it wasn't a complete loss.

We also did some window shopping at a music store that's in the mall (yes - kind of odd).  This music store sells guitars, keyboards and also full-size grand pianos.  We're contemplating getting a baby grand piano to use at the house.


I've played piano since I was 5 and I love playing.  When I was in an apartment in Connecticut, I needed something to play, so I paid $$ for a digital piano by Kawai.  While it wasn't the same as playing on a real piano, it was close and sounded very good.  It still sounds very good over 10 years later.  Now that we're in our house and not really moving anymore (hopefully), we'd really like to get a full piano versus the digital piano.

A friend of ours has a used Steinway and every time we visit them, we play and wish we had one of our own.  So now we're starting to check out a few places that sell them.  I'm not bit into name brands, so the piano doesn't have to be a Steinway (I've played on some really great Steinways...and some really bad Steinways).  For me, it all comes down to how the piano feels and what it sounds like.  Heck, I'd buy a Yamaha grand piano if I loved how it played and sounded.  I'm a bit partial towards Kawai pianos as they have a very clear, bright sound to them and they don't sound muddled like some of the "old-name" pianos sound.

The best part about window shopping for pianos is that you get to try them all out. :-)  When we went to the mall this weekend, we didn't have any music with us, so it was playing bits and pieces by memory.  We plan on checking out another place this weekend and we'll be sure to bring music with us this time.

So what's my plan for quilting items this week??

1. Quilt client quilt and remove from frame.
2. Hand-sew binding on Charity quilt.
3. Hand-sew binding on Whirly Stars quilt.
4. Square-up backing fabric for Lone Star quilt.

Happy Crafting!
~Sarah at upstateNYCreations


Monday, October 22, 2012

Make-A-List Monday

Last week was a very productive week for me.  It is so nice to get some finishes after having no finishes for a long time!  I was originally supposed to have all of Friday and 90% of Saturday to myself while my husband went to a friend's place to help pull in a dock.  He was scheduled to be back late Saturday, but after a bad Friday, he ended up leaving early and was back home Saturday afternoon.  While it was good to have him back, he wasn't feeling well, so a lot of Saturday afternoon/evening was spent making sure he was ok.

Thankfully, it appears that it was a lack of sleep problem, because after sleeping 12 hours from Saturday to Sunday, he was fine all day Sunday.

"The List" from last week....
 1. Complete hand-sewing of binding on client quilt.  DONE!  In fact, the entire quilt is now washed and ready to give to my client this coming weekend.

  Client_Quilt_1-x
2. Press strips together for 2nd baby quilt. DONE!  The entire top is actually together.

IMG_1921

3. Design 3rd baby quilt (yes, another one in addition to the one from last week). Done!  I have to play with the borders a little bit more, but I have all the fabric purchased and it is now ready for cutting into strips and blocks.

IMG_1917

4.  Play with EQ6 to get fabric amounts/colors for a smaller version of Judy's Sing A Happy Song quilt pattern for 4th baby quilt. I didn't get to this item this past week.
5.   Hand-sew binding on Shine on Bayou Cane quilt.I did a little bit here, but not a whole lot.  I spent most of the week doing binding for the client quilt.

I'm hoping this coming week will be productive too.  Here is my plan:
1. Cut fabrics for the boy baby quilt (I have to work on a name for this).
2. Start sewing blocks for the boy baby quilt.
3. Select backing and quilting pattern for 2nd baby quilt.
4. Load baby quilt on frame and start to quilt.
5. Play with EQ6 to get fabric amounts/colors for a smaller version of Judy's Sing A Happy Song quilt pattern for 4th baby quilt.

Happy Crafting!
~Sarah at upstateNYCreations

Sunday, October 21, 2012

Stashbusting 2012 - Week 42

Its been a few weeks since I posted for stash busting, not because I haven't been sewing, but because I wasn't really using any stash.

I did finish up a client's quilt this week.   I posted more pictures here.

Client_Quilt_1-x

I also stopped at my local quilt shop and bought fabrics for another baby quilt for a baby boy.  It was fun picking out the fabrics to make it "boyish".


IMG_1917

I also finished up a little quilt top I was working on the past day or two.  It came together really quickly.  I'm not sure if I'm going to quilt it right away or wait a little bit.

IMG_1921

So with this last top completed, I did use a little bit of stash this week.  The binding is also ready to go, but I'll have to still pick out some backing material.

Here are my numbers:

Added This Week:       5.0 yards
Added Year to Date:    23.54 yards
Used This Week:          2.06 yards
Used Year to Date:       23.2 yards
Net Year to Date:         0.35 yards

I'm just a smidge in the hole now after buying 5 yards, but I'll use that up fairly soon and once I pick out some backing material, I'll definitely be back in the positive.

Check out how everyone else is doing this week over on Judy's blog.

Happy Crafting!
~Sarah at upstateNYCreations

Saturday, October 20, 2012

Client Quilt - Monkey in the Middle Finished

The client quilt, Monkey in the Middle, is finally completely finished.  I'm currently waiting for it to finish going through the washer and dryer.  I can't wait to feel its cuddly softness when its done.  :-)

Here's a few pictures of the finished quilt.  The quilting added phenomenal texture to the quilt.

Client_Quilt_1-x

IMG_1910

IMG_1914

IMG_1913

I also designed the next baby quilt that I'm making for some friends of ours.  They are expecting a baby boy in January.  I stopped by my local quilt shop, The Joyful Quilter, this morning and picked up the fabrics for the quilt.  Its going to be very cute!

IMG_1917

Its a bit of a "scrappy" pattern which I think will look really great when the quilt is finished.

Now I'm off to prep some fabrics and spend my afternoon sewing. :-)

Happy Crafting!
~Sarah at upstateNYCreations

Friday, October 19, 2012

Client Quilt - Monkey in the Middle

I'm a little behind on posting status for the client quilt I've been working on.  I actually just finished up the binding last night, but I'd like to share some pictures of the quilting as it was progressing.

This was a fairly tricky pattern to quilt as it was originally sized as a 9.5" wide pattern.  The max area I can quilt is only about 5", so I had to do some reducing.  In doing that I also had to simplify the design since some of the detail was just too small for my machine to be able to handle.  Here's an up-close picture of the quilting in one area:


IMG_1863

Here's one with it completely quilted and still partially on the frame.  I love the texture this quilting put onto the quilt.  I think its going to be really great once the quilt is washed.

IMG_1865

Since the weather has also gotten colder lately, we've had a few fires in the fireplace so far.  Ellie, the cat, is definitely happy about the fireplace.  She gets just about as close as she can to it.  When we have to add wood or poke the fire, we physically have to push her out of the way as she won't voluntarily move from in front of the fire.

Kitty_2

Kitty_1


Happy Crafting!
~Sarah at upstateNYCreations

Monday, October 15, 2012

Make-A-List Monday

 Another week has already gone by and we're in the middle of October.  Time sure does fly.  I've gotten a lot of sewing done the last week, although I don't have pictures uploaded yet.

Part of the reason for the lack of posting is that I found out this past week that the usual site I use for hosting pictures (Webshots) is changing their service and will no longer be free.  So I've spent part of the past week transferring images from Webshots over to Flickr and updating my blog posts.  I've updated all of the individual posts on this blog, but I'm debating on what to do with my old blog.  I have a lot of pictures there and just general documentation of things that went on in my life for the past 4 years.  Webshots is discontinuing their free surface on November 1st, so there's really no way to update all the posts by then.

I do have the pictures downloaded and labeled the way Webshots had it labeled, so I should be able to back-track the pictures to the posts at some point in the future.

The other thing that has been keeping me busy this past week is quilting on the client quilt.  It took a bit longer than I expected to get quilted... a total of 7.5 hours.  It looks absolutely gorgeous though and the quilting added so much texture to the quilt.  I'll share some pictures a little later this week.

So the list from last week:
1.  Complete 3 rows of quilting on client quilt each night.  DONE!
2.  Add binding onto quilt on Friday evening.  DONE - but not on Friday.  Binding got machine sewn on Sunday evening.
3.  Hand-stitch at least half the binding down by Sunday evening.  I only have 1/4 of the binding down.
4.  Sew strips together for 2nd baby quilt. DONE!
5.  Play with EQ6 to get fabric amounts/colors for a smaller version of Judy's Sing A Happy Song quilt pattern. Not done.

Overall it was a pretty good week and I'm glad I have the quilting done on the client quilt.

Here's the plan for this coming week:
1. Complete hand-sewing of binding on client quilt.
2. Press strips together for 2nd baby quilt.
3. Design 3rd baby quilt (yes, another one in addition to the one from last week).
4.  Play with EQ6 to get fabric amounts/colors for a smaller version of Judy's Sing A Happy Song quilt pattern for 4th baby quilt.
5.   Hand-sew binding on Shine on Bayou Cane quilt.

Happy Crafting!
~Sarah at upstateNYCreations

Monday, October 8, 2012

Make-A-List Monday

Last week was a very productive week for me.  I was able to complete all my goals!  Yay! :-)  I think that's a first for the year.

Here was the plan:
1. Go to Quilt Guild meeting on Monday evening.  Done!  I need to think about at least 4 UFOs that I can get done by June to participate in a guild challenge.  Since I machine piece/quilt, I should be able to find four projects that will fit the bill.
2. Sew entire center portion of quilt together. Done!  I was able to get the entire quilt top sew on Tuesday evening.
3. Add long strips to both sides of the 4 piano key border units. Done!
4. Add borders to the quilt. Done! I was able to add all the borders and finish the quilt top on Wednesday evening.
5. Print directions for making a pillow cover.  Done!  I even completed the pillow cover and have the pillow form stuffed inside it.  It looks pretty cute I must say.

This is the overall look of the quilt now that the borders are on.  The quilting I'm doing is in a green variegated thread, which really stands out against the orange and yellow.  It even stands out pretty well against the greens, so there's no hiding on this one!

Client Quilt #1

I also made quite a bit of progress on things over the weekend.  I didn't get as much done as I would have liked, but the weekend included shopping at Target, shopping at Joann's (always dangerous...at least for my wallet), a four-hour shopping trip to some outlets for work attire for both of us, and the usual laundry and grocery shopping on Sunday.

I have the client quilt loaded onto the frame and started quilting.  Its going to take me longer than I expected to quilt this one as the pattern is more intricate than I originally thought.  Sometimes things look so good and easy on paper and when you start to stitch them....not so easy, but still good looking. :-)  It takes me about 30 minutes to quilt one row of the pantograph, and I have about 15 rows to do.  I was able to get 3 rows done last night (which a bobbin lasts about 2.75 rows).  I'm hoping to get another 3 or 4 rows done tonight.

I also started pressing/cutting fabric for another baby quilt for a friend of ours.  This quilt is a simple pattern and I think when I quilt it, it will just be a simple stipple pattern.  They don't know if its going to be a boy or a girl, so the quilt and stitching needs to be fairly generic.

Goals for this week:
1.  Complete 3 rows of quilting on client quilt each night.
2.  Add binding onto quilt on Friday evening.
3.  Hand-stitch at least half the binding down by Sunday evening.
4.  Sew strips together for 2nd baby quilt.
5.  Play with EQ6 to get fabric amounts/colors for a smaller version of Judy's Sing A Happy Song quilt pattern.

Hope everyone has a great week!

Happy Crafting!
~Sarah at upstateNYCreations

Sunday, October 7, 2012

Stashbusting 2012 - Week 40

Although I haven't busted any stash lately, I have been quilting up a storm.  The quilt below is for a client and since the fabric I purchased is completely in this quilt now, I didn't count it as part of the stash reports.

I was able to put the entire quilt top together in about 20 hours or so.  I also have a coordinating pillow that has a larger version of the corner square-in-square blocks on the front of it.

Client Quilt #1

So here are my numbers as they stand right now.

Added This Week:       0.0 yards
Added Year to Date:    18.54 yards
Used This Week:          0.12 yards
Used Year to Date:       21.12 yards
Net Year to Date:         -2.58 yards

I have a baby quilt in the works that is using stash fabric, so that will most likely get counted next week.  I also have a 2nd baby quilt that I need to make for a good friend of ours, so that one will involve purchasing some fabric for the pattern I want to use.

Hope everyone else is doing well with their reports.  Go on over to Judy's blog to see other's stashbusting efforts.   

Happy Crafting!
~Sarah at upstateNYCreations

Monday, October 1, 2012

Make-A-List Monday

 Things have been very busy for me the past few weeks I'm sorry to say.  Wile I have made progress on quilts, life seems to be getting the better of me lately.  My last Make-a-List Monday post was 3 weeks ago now.  I can't believe we're already into October at this point.  Time seems to go by WAY too quickly.

So here's what I had planned for the prior weeks:
1. Post pictures of client quilt fabric when it arrives.
2. Press FQs and get them ready for storage.
3. Draft up directions for client quilt.

I did post about my client's quilt and directions for making the main blocks of the quilt here.  I also pressed a whole bunch of the fat quarters (FQs) and found a temporary home for them in my closet.  I have actually made a lot of progress on the client quilt.  I have all the blocks made for the center, the corner border blocks made and the piano key borders made.  At this stage, I need to sew blocks together into the quilt top, then finish up the borders and add them to the quilt.

Here's what I plan for this week (my hubby is traveling 2 days, so that will increase the sewing time):
1. Go to Quilt Guild meeting on Monday evening.
2. Sew entire center portion of quilt together.
3. Add long strips to both sides of the 4 piano key border units.
4. Add borders to the quilt.
5. Print directions for making a pillow cover.

Happy Crafting!
~Sarah at upstateNYCreations

Saturday, September 29, 2012

Monkey Wrench Quilt - Block Tutorial # 1

I have a quilt for client that I'm making and thought I would do a tutorial for how to make the main blocks for the quilt.  The block itself has a few names, but the two that I know are Monkey Wrench and Snail's Tail.  It is a traditional block.

The quilt itself is a total of 56" x 56" including borders, but the center portion that has the Monkey Wrench blocks is 48" x 48" and uses 16 12" blocks.

The fabrics for this particular quilt are to go along with a Jungle theme in the nursery.  I love seeing the fabric all pressed and folded ready for cutting, so I couldn't help but share this photo. :-)  The middle fabric is actually for the border, so the four colors for the blocks are the orange, yellow, medium green and dark green fabrics.

Client_Quilt_1-1

The cutting directions that I have here are for a total of 16 blocks to make the 48" x 48" center of this quilt.  The following strip widths and quantities need to be cut from each of the four colors.
  • 1 strip of each color cut 2" in width
  • 1 strip of each color cut 3-7/8" in width
  • 1 strip of each color cut 4-1/4" in width
  • 2 strips of each color cut 6-7/8" in width
  • 1 strip of each color cut 7-1/4" in width

Client_Quilt_1-3
 
When sub-cutting the strips into squares and triangles, set aside the remaining pieces to strips if you plan on making this full quilt.  The pieces for the corner blocks for the quilt can be cut from the remaining pieces of the strips.

The smallest strips can be cut into squares.  The rest of the strips are cut either once on the diagonal to obtain half square triangles, or twice on the diagonal to obtain quarter square triangles.
  • 3-7/8" squares - cut twice on diagonal
  • 4-1/4" squares - cut once on diagonal
  • 6-7/8" squares - cut twice on diagonal
  • 7-1/4" squares - cut once on diagonal
Here are all the individually cut pieces laid out in the pattern for the overall block.
Client_Quilt_1-2

Start with the middle squares and sew them into pairs, pressing seams towards the darkest fabrics (the greens in the photo below).

Client_Quilt_1-4


Next, sew the pairs into four-patches and nest the seams while sewing.

Client_Quilt_1-5

Next, you want to sew the triangles to the flat edges of the four-patch.  I have two different methods of doing this that I show below.  Either one works and it will really depend upon what you are comfortable with.  For this first set of triangles, I lined up the point of the triangle with the vertical seam (see 2nd picture below).  I also added one color at a time as I went around the blocks, pressing the seams after each triangle was added.

Client_Quilt_1-6

Client_Quilt_1-7


Here's a picture of the first square with all triangles added to the four-patch.  Make sure you square up your block at this stage.  You may not have a perfectly square block if your seams are off a little bit.  Obviously you want to get your seams as perfect as you can, but we're all human and we're not perfect! :-)

My blocks didn't end up perfectly square, but I did make sure that I trimmed my edges such that I had a quarter inch distance between the points and the edge of the fabric.  This will at least make your quilt appear to have perfect seams and corners.

Client_Quilt_1-8

This is the other method I used for adding the triangles to the edges for the subsequent rounds.  First take your triangle and fold it in half with the right sides facing out.

Client_Quilt_1-9

Line up the folded seam with the intersection point on your block.  This will ensure that your triangle is properly centered on the straight edge without having to physically mark the centers of each of the pieces.

Client_Quilt_1-10

Unfold the triangle and pin it in place.  I've found it best to pin at the middle and again at the front edge where it first goes under the pressure foot.  Notice how the yellow and orange triangles in the picture below are right at the intersection points for the squares "under" them.  I can definitely say my block wasn't absolutely square, but because I took the time to trim the edge to be 1/4", the next piece I added was at the exact spot it needs to be to show that "perfect" corner.

Client_Quilt_1-11

What I also did on these additional triangles is to add the triangles on opposite sides of the square at the same time.  This reduced the number of times that I had to get the iron heated up to press the seams.  Its still the same number of seams to press, but it was faster this way.

Client_Quilt_1-12

Here's a photo of the next-to-last round of triangles added to the center square.

Client_Quilt_1-13

Keep adding the triangles around the block until it is finished.  Then square up your final block.

Client_Quilt_1-14

In the photo above, I still had to had the last two triangles to the square, I do have a picture at this point, but did not upload it yet.  I will add that picture once it is uploaded.

The next tutorial will show how to make the corner blocks and then the final border (piano key border).

Happy Crafting!

~Sarah at upstateNYCreations